Navantia UK has confirmed progress on its £115 million funding throughout 4 British shipyards, with supply now underway of a brand new mechanised panel manufacturing system for the Fleet Stable Help (FSS) vessel programme, the corporate acknowledged.
The corporate mentioned the Pemamek panel line, a digitally built-in fabrication system, has efficiently handed manufacturing unit acceptance assessments and is being shipped to Harland & Wolff for set up in its expanded fabrication corridor.
As soon as operational, the system will automate the manufacturing of flat panels for the Royal Fleet Auxiliary’s FSS ships, bettering productiveness, precision, and high quality.
Harland & Wolff modernisation sees new robotic welding line
In keeping with Navantia UK, the funding is a part of a broader effort to construct long-term industrial capability and strengthen the UK’s naval manufacturing base. The corporate added that “new apprentices are becoming a member of us to develop the expert workforce of the longer term, coaching on cutting-edge capabilities that can strengthen UK shipbuilding for many years to come back.”
Navantia UK is a part of Crew Resolute, alongside Harland & Wolff and BMT, liable for delivering three Fleet Stable Help ships to the Royal Fleet Auxiliary. The vessels will present logistics assist to Royal Navy service strike teams and different process forces worldwide.
Navantia UK CEO units out technique after Belfast takeover
The federal government lately confirmed that Harland & Wolff’s capability to contribute to Royal Navy shipbuilding was assessed earlier than the Fleet Stable Help (FSS) contract was awarded, in keeping with a written reply within the Home of Lords on 1 October.
Baroness Ritchie of Downpatrick requested what evaluation had been made from the Belfast yard’s capability to assemble warships. Responding, Defence Minister Lord Coaker mentioned the FSS competitors was designed to make sure British shipbuilders may play a central position, with the award finally going to Navantia UK, which included Harland & Wolff as a strategic subcontractor. Lord Coaker acknowledged:
“The construct technique was, and stays, that each one three ships will probably be assembled from blocks manufactured in H&W’s shipyards within the UK and Navantia’s shipyards in Spain. Ultimate meeting, methods integration and testing of the ships is deliberate to happen in Belfast.”
He added that the programme required round £100 million of funding within the Belfast yard to recapitalise amenities and switch expertise and expertise. The Ministry of Defence concluded that Harland & Wolff was able to assembly its obligations, with Navantia UK liable for managing subcontractors beneath the prime contract.
Since Harland & Wolff’s insolvency, Navantia UK has taken over its 4 shipyards. Coaker famous that work to modernise the Belfast yard has now resumed, strengthening UK capability and productiveness in naval development.

